Thad ᱨᱮᱱᱟᱜ Reconstruction in Pudong Shanghai ᱦᱟᱥᱯᱤᱪᱟᱹᱲ ᱵᱤᱞᱰᱤᱝ ᱫᱚ ᱟᱨᱠᱤᱴᱮᱠᱪᱟᱨ, ᱤᱢᱟᱨᱚᱛ ᱟᱨ ᱜᱟᱲᱚᱱ ᱰᱤᱡᱟᱭᱤᱱ ᱯᱨᱚᱛᱤᱡᱚᱜᱤᱛᱟ ᱵᱷᱟᱜ ᱨᱮ 2021 A' Design Award ᱠᱟᱥᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ ᱨᱮᱱᱟᱜ ᱟᱹᱰᱤ ᱢᱟᱱ ᱟᱠᱟᱱ ᱡᱤᱛᱠᱟᱨ ᱠᱟᱱᱟ᱾
ᱠᱟᱥᱟᱟᱨᱠᱤᱴᱮᱠᱪᱟᱨ· 2021
Reconstruction in Pudong Shanghai ᱦᱟᱥᱯᱤᱪᱟᱹᱲ ᱵᱤᱞᱰᱤᱝ
Thad ᱞᱮᱠᱟᱛᱮ
ᱜᱟᱦᱟᱠ: Architectural Design and Research Institute of Tsinghua University Co.,Ltd.
ᱟᱨᱠᱤᱴᱮᱠᱪᱟᱨ ᱵᱷᱟᱜ ᱨᱮ A' Design Award ᱠᱟᱥᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ ᱡᱤᱛᱠᱟᱨ
ᱡᱟᱸᱪ ᱟᱠᱟᱱ ᱮᱣᱟᱨᱰ ᱡᱤᱛᱠᱟᱨ
#121374 ᱞᱟᱜᱤᱫ ᱮᱣᱟᱨᱰ ᱦᱟᱞᱚᱛ ᱡᱟᱸᱪᱰᱤᱡᱟᱭᱤᱱ
Reconstruction in Pudong Shanghai ᱦᱟᱥᱯᱤᱪᱟᱹᱲ ᱵᱤᱞᱰᱤᱝ ᱵᱟᱵᱚᱛ ᱛᱮ
ᱦᱩᱰᱟᱝ ᱯᱩᱰᱳᱝ ᱥᱟᱸᱜᱦᱟᱭ ᱨᱮ ᱨᱤᱠᱚᱱᱥᱴᱨᱚᱠᱥᱚᱱ ᱪᱤᱱ ᱨᱮᱭᱟᱜ ᱥᱟᱸᱜᱦᱟᱭ ᱪᱷᱚᱴ ᱨᱮᱭᱟᱜ ᱮᱠᱴᱟ ᱡᱚᱱᱚᱜ ᱦᱟᱥᱯᱤᱪᱟᱹᱲ ᱨᱮᱭᱟᱜ ᱟᱶᱴᱯᱮᱥᱮᱸᱴ ᱟᱨ ᱮᱢᱚᱨᱡᱮᱱᱥᱤ ᱢᱮᱰᱤᱠᱟᱞ ᱴᱮᱠᱱᱳᱞᱚᱡᱤ ᱠᱚᱢᱯᱞᱮᱠᱥ ᱨᱮᱭᱟᱜ ᱨᱤᱠᱚᱱᱥᱴᱨᱚᱠᱥᱚᱱ ᱟᱨ ᱵᱟᱲᱦᱟᱣ ᱠᱟᱱᱟ ᱾ ᱰᱤᱡᱟᱭᱤᱱ ᱨᱮ ᱱᱟᱶᱟ ᱱᱤᱨᱢᱟᱹᱬ ᱥᱟᱶᱮᱱ ᱮᱠᱴᱟ ᱡᱚᱱᱚᱜ ᱛᱮᱭᱟᱨ ᱦᱚᱲᱚᱜ-ᱟ ᱨᱮᱭᱟᱜ ᱡᱟᱛᱟ ᱠᱩᱴᱟᱢ ᱡᱩᱲᱟᱹᱣ ᱮᱱᱟ ᱾ ᱱᱚᱶᱟ ᱠᱟᱹᱢᱤ ᱚᱱᱚᱞ ᱚᱭᱟ ᱟᱴ ᱛᱟᱦᱮᱱ ᱨᱮ ᱵᱟᱭ ᱦᱟᱹᱴᱤᱭᱟᱸ ᱠᱟᱱᱟ ᱄ ᱥᱟᱸᱜᱦᱟᱲ, ᱴᱨᱟᱸᱡᱤᱥᱚᱱ, ᱨᱤᱠᱚᱱᱥᱴᱨᱚᱠᱥᱚᱱ ᱟᱨ ᱨᱮᱥᱴᱚᱨᱮᱥᱚᱱ ᱾ ᱴᱮᱢᱯᱚᱨᱟᱨᱤ ᱟᱨ ᱠᱚᱱᱣᱟᱨᱴᱮᱰ ᱮᱠᱴᱟ ᱡᱚᱱᱚᱜ ᱵᱤᱞᱰᱤᱝ ᱠᱚ ᱴᱨᱟᱸᱡᱤᱥᱚᱱ ᱥᱴᱮᱡ ᱨᱮ ᱢᱮᱰᱤᱠᱟᱞ ᱥᱟᱨᱣᱤᱥ ᱠᱚ ᱪᱟᱞᱩ ᱜᱚᱲᱚ ᱠᱟᱱᱟ ᱾ ᱯᱷᱟᱥᱟᱰ ᱨᱮ ᱯᱚᱸᱰ ᱟᱞᱩᱢᱤᱱᱤᱭᱚᱢ ᱯᱮᱱᱮᱞ ᱠᱚ ᱵᱮᱵᱷᱟᱨ ᱦᱚᱲᱚᱜ-ᱟ, ᱠᱩᱨᱩᱢᱩ ᱠᱚ ᱨᱮ ᱠᱟᱴ ᱨᱮᱭᱟᱜ ᱰᱤᱡᱟᱭᱤᱱ ᱟᱠᱟᱱ ᱟᱞᱩᱢᱤᱱᱤᱭᱚᱢ ᱯᱮᱱᱮᱞ ᱠᱚ ᱥᱟᱶᱮᱱ, ᱟᱨ ᱰᱷᱟᱸᱨᱚᱢ ᱰᱷᱟᱸᱣ ᱠᱟᱴᱷᱤᱨᱟᱹ ᱡᱷᱤᱡᱷᱨᱤ ᱠᱚ ᱥᱟᱶᱮᱱ ᱾
ᱢᱟᱱᱟᱱ
A' Design Award ᱠᱟᱥᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ ᱵᱟᱵᱚᱛ ᱛᱮ
Reconstruction in Pudong Shanghai ᱦᱟᱥᱯᱤᱪᱟᱹᱲ ᱵᱤᱞᱰᱤᱝ ᱫᱚ A' Design Award ᱠᱟᱥᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ ᱧᱟᱢ ᱟᱠᱟᱱᱟ, ᱱᱚᱶᱟ ᱫᱚ ᱱᱟᱣᱟ ᱵᱷᱟᱵᱱᱟ ᱛᱮ ᱵᱷᱟᱞᱟᱭ ᱰᱤᱡᱟᱭᱤᱱ ᱠᱚ ᱞᱟᱹᱜᱤᱫ ᱮᱢ ᱟᱠᱟᱱ ᱥᱚᱢᱟᱱ ᱠᱟᱱᱟ᱾ ᱱᱚᱶᱟ ᱠᱚ ᱫᱚ ᱰᱤᱡᱟᱭᱤᱱᱟᱨ ᱠᱚ ᱨᱮᱭᱟᱜ ᱵᱷᱟᱵᱱᱟ ᱟᱨ ᱵᱷᱟᱞᱟᱭ ᱠᱟᱢᱤ ᱡᱷᱟᱞᱠᱟᱣ ᱠᱚ᱾ Reconstruction in Pudong Shanghai ᱦᱟᱥᱯᱤᱪᱟᱹᱲ ᱵᱤᱞᱰᱤᱝ ᱫᱚ ᱠᱚᱞᱟ, ᱣᱤᱜᱭᱟᱱ, ᱰᱤᱡᱟᱭᱤᱱ ᱟᱨ ᱴᱮᱠᱱᱚᱞᱚᱡᱤ ᱨᱮᱭᱟᱜ ᱥᱤᱢᱟ ᱵᱟᱲᱦᱟᱣ ᱟᱨ ᱫᱩᱱᱤᱭᱟ ᱵᱷᱟᱞᱟᱭ ᱞᱟᱹᱜᱤᱫ ᱜᱚᱲᱚ ᱮᱢ ᱠᱟᱱᱟ᱾
ᱰᱤᱡᱟᱭᱤᱱ ᱯᱤᱪᱷᱟ ᱨᱮ
ᱯᱨᱮᱥ ᱠᱤᱴ
ᱰᱤᱡᱟᱭᱤᱱᱟᱨ ᱧᱮᱞ ᱠᱷᱚᱱ ᱠᱨᱮᱰᱤᱴ, ᱴᱤᱢ ᱥᱫᱚᱥᱭ ᱟᱨ ᱴᱮᱠᱱᱤᱠᱮᱞ ᱵᱤᱵᱚᱨᱚᱬ ᱮᱢ ᱟᱠᱟᱱᱟ᱾
- ᱟᱞᱜᱟ ᱜᱩᱱ ᱠᱚ
- This project is reconstruction and expansion project of the outpatient and emergency medical Technology complex building of the People's Hospital in Pudong New District, Shanghai, China.It has the modernity of new buildings and the complexity of reconstruction and expansion. The generation of the building is post-occupancy evaluation combined with Chinese traditional Yin-Yang theory.
- ᱢᱟᱯ ᱟᱨ ᱯᱮᱠᱮᱡᱤᱝ
- the project is with buildings scale of 135,357 square meters and an area of 45,108.7 square meters
- ᱴᱮᱜ ᱠᱚ
- Architecture, Design, Hospital, Reconstruction, Restoration
- ᱛᱮᱭᱟᱨ ᱛᱮᱠᱱᱚᱞᱚᱡᱤ
- The facade of the building is made of 2 kinds of aluminum plate. Mainly uses white aluminum. In the conner of the facades, architects use wood grain aluminum plate. Floor-to-ceiling windows are widely used by the new building.
- ᱰᱤᱡᱟᱭᱱ ᱪᱮᱞᱮᱧ
- Transition project stage: In order to demolish the existing buildings in the new building land, the form of temporary turnover needs to be adopted. Architects transformed function of office buildings and wards to outpatient units. In order to meet the needs of normal business development during the transition period, 3,200 square meters of temporary buildings were built and 13,199 square meters of existing buildings were integrated and transformed. Restoration and renovation project stage: demolish the science and education building, dormitory building, Meixian building, ground machinery garage, activity center (canteen), east gate guard, garbage room, etc. on the red line of the transition project site; demolish the temporarily built outpatient building in the site.
- ᱜᱚᱵᱮᱥᱚᱱᱟ
- Due to the particularity of the reconstruction and expansion projects, it is necessary to conduct an in-depth post-occupancy evaluation of the existing functions and environment.Due to the particularity of the hospital building, it is necessary to adopt systematic concepts and methods. The hospital building includes three basic processes of human flow, logistics, and information flow. From the overall planning and single plan design, specific analysis should be made for different types of human flow and logistics according to the difficulties of hospital construction. Architects decided to Step-by-step implementation of construction, Demolition-Transition-Reconstruction-Restoration.
- ᱯᱨᱮᱨᱚᱱᱟ
- In order to build a large-scale modern hospital in China, the project reconstructs and expanses an outpatient and emergency medical technology complex building. Design adjusted functional optimization overall of the new and old buildings to achieve four design goals: Change the current existing traffic system and functional process problems; Build the hospital's aortic traffic; Strengthen the positioning and construction of key departments; improve the hospital environment and quality.
- ᱯᱨᱚᱡᱮᱠᱴ ᱥᱚᱢᱚᱭ
- The project started in May 2018 and will be finished in 2025 in Shanghai, China.
- ᱠᱟᱹᱢᱤ ᱦᱚᱨ
- The hospital is operated by the government. Due to the outdated construction facilities of the outpatient building and medical technology building, and insufficient functional space, the medical process cannot meet the service demand. The architects carried out the reconstruction and expansion of the outpatient and emergency medical technology complex building on the basis of the demolition of the existing outpatient building, medical technology building and other old buildings in the People's Hospital of Pudong New Area.
- ᱴᱤᱢ ᱥᱮᱫᱟᱭ ᱠᱚ
- Yao Hong, Fu Liewu, Li Fei, Wang Xiaohan, Cai Zhengqiang, Jin Cheng, Meng Xianghao, Zhang Lan, Hu Bo
- ᱪᱤᱛᱟᱹᱨ ᱥᱟᱹᱦᱟ
- Image #1: Architectural Design & Research Institute Tsinghua University, Beijing, 2021.
Image #2: Architectural Design & Research Institute Tsinghua University, Beijing, 2021.
Image #3: Architectural Design & Research Institute Tsinghua University, Beijing, 2021.
Image #4: Architectural Design & Research Institute Tsinghua University, Beijing, 2021.
Image #5: Architectural Design & Research Institute Tsinghua University, Beijing, 2021.
ᱥᱯᱚᱱᱥᱚᱨᱰ
Designers.org ᱠᱷᱚᱱ ᱯᱟᱨᱚᱢ ᱛᱟᱞᱟᱥ
ᱟᱞᱮᱭᱟᱜ ᱵᱤᱜᱽᱭᱟᱯᱚᱱ ᱥᱟᱹᱜᱟᱹᱭ ᱠᱚ ᱠᱷᱚᱱ ᱯᱨᱚᱰᱟᱠᱴ, ᱥᱮᱵᱟ ᱟᱨ ᱢᱚᱠᱟ ᱩᱫᱩᱜ ᱢᱮ᱾
ᱟᱨᱦᱚᱸ ᱠᱷᱚᱡ ᱢᱮ
ᱥᱟᱹᱜᱟᱹᱭ ᱰᱤᱡᱟᱭᱤᱱ ᱠᱚ
ᱢᱤᱫ ᱞᱮᱠᱟ ᱠᱮᱴᱮᱜᱚᱨᱤ ᱠᱷᱚᱱ ᱟᱨᱦᱚᱸ ᱯᱩᱨᱥᱠᱟᱨ ᱧᱟᱢᱟᱠᱟᱱ ᱰᱤᱡᱟᱭᱤᱱ ᱠᱚ ᱧᱮᱞ ᱢᱮ, ᱡᱚᱜᱭᱟᱛᱟ ᱧᱮᱞ ᱛᱮ ᱵᱟᱪᱷᱟᱣ ᱟᱠᱟᱱᱟ᱾