跳至内容
Bai Yu 的作品 Midea Heyou 医院

设计师 Bai Yu 的作品 Midea Heyou 医院 荣获了极具声望的 2022 A' Design Award 银奖,竞赛类别为建筑与结构设计。


银建筑· 2022

Midea Heyou 医院

设计师: Bai Yu

客户: BAI Design International

建筑类别A' Design Award 银奖获奖者

19,746

已验证的获奖者

验证 #127351 的获奖状态

色彩

设计作品

关于 Midea Heyou 医院

美的和祐是一座为中国佛山顺德区设计的医院。该医院作为一所综合性医疗中心,将以治疗为主导的模式转变为面向全社区、全生命周期的健康主导模式。设计灵感源自当地的水乡景致与纵横交错的河道。庭院与空中花园将阳光、清新空气与绿意引入室内。斜交网格幕墙以及集成太阳能系统的屋顶有效降低了能耗。模块化的平面布局使各医疗单元能够随时间灵活调整。

荣誉认可

关于A' Design Award 银奖

Midea Heyou 医院是 A' Design Award 银奖得主,这是授予顶级、华美而令人印象深刻的设计的极为崇高的认可。银奖得主是极其卓越、极具创造力的作品,展现出其设计师杰出的专业技能、才华与敏锐。预计Midea Heyou 医院将成为一件出色的典范之作,兼具非凡的专业性与深刻的创新性。这件赢得 A' Design Award 银奖的设计是一项备受瞩目、令人钦佩的发明,造福并拓展艺术、科学、设计和技术的边界。Midea Heyou 医院是一件令人羡慕的创作,它唤起渴望,带来积极的情感,并激发惊叹与赞叹。

设计幕后

媒体资料包

由设计师提供的致谢、团队成员及技术详情。

独特属性
Heyou International Hospital will serve as a comprehensive medical center, shifting from a traditional "treatment-led" to a "health-led" approach, to be accessible to the whole community, applicable to the whole life cycle and cover the whole medical spectrum. The design is committed to improving the artistic aspects of medical building, creating an art gallery experience with a healing environment, integrating advanced energy-saving technologies, setting a new trend in future hospitals, ensuring the foresight of its medical use, while making it more friendly to people.
尺寸与包装
The project has a total site area of 152,234sqm, with a total GFA of about 260,000sqm in phase I (planned capacity of 1,000 beds), and a total planned GFA of about 380,000sqm in the long term (planned capacity of 1,500 beds) and a daily outpatient capacity of about 6,500 people. Phase I consists of a medical complex (133,126sqm), an office building (29,700sqm) and a International Medical Centre IMC (22,656sqm). The medical complex covers emergency, outpatient, medical technology, proton therapy, nuclear medicine and radiotherapy, critical care, rehabilitation etc..
标签
Architecture, Hospital, Medical, Health, Healing, Garden, Art, Nature, Energy-saving,
生产技术
The integration of technological innovation and the return of technology to nature: By adopting cutting edge structural design and materials to reduce energy consumption and create a zero carbon emission hospital, and to allow energy saving technology and health care to co-exist. The roof is integrated with curtain wall and photo-voltaic/solar energy system, signifying the idea of returning of technology to nature. The main facade adopts a dia-grid structural system - a high-tech approach to construction, and its unique facade creates an identity in the medical and health sector.
设计挑战
Medical buildings are always subject to changes in medical processes and medical equipment, so a more structured layout and modular 'plug-in' design is more conducive to adapting to the changes. The innovation and challenge of medical architecture is reflected in the project's 'whole life cycle' architectural concept, where design is no longer aimed at the current optimum of building and function, but rather at adapting to the changing use and function of the hospital.
研究
The outbreak of the corona virus has brought about a considerable impact on all industries and has sounded the alarm for the environmental safety of design for medical buildings, as medical buildings are projects not only for the diagnosis and treatment of diseases and the maintenance of human health, but also for the key prevention and control sites of public health emergencies. For the future development of medical building design, combined with the design practice of this project, the project team have conducted an in-depth study on a number of design aspects.
灵感
The design is inspired by the ancient Lingnan water townscape of Shunde, with its crisscrossing rivers, to create a "garden hospital" that will live in symbiosis with nature. The interior incorporates landscape features such as courtyards and sky gardens, bringing sunlight, fresh air and greenery into the hospital, making the hospital as a whole resemble an urban garden. Nurture and growth are the most beautiful themes in nature, and the design allows the building to grow into nature.
项目周期
The project is located in Shunde District, Foshan City, Guangdong Province, China. Design work has commenced in 2020 and construction has started in early 2021, with the foundation stone laid in November 2020. Construction is expected to be completed by the end of 2023, with the official opening and operation of the project expected to take place in 2024.
操作流程
The masterplan adopts the concept of "one axis, two belts, three zones, eight scenes and one pictorial landscape", allowing the medical use and function to fully integrate with nature. The landscape axes are introduced to open up view corridors, along which medical spaces can have a symbiotic relationship with nature, a healing environment is thus created, making the medical complex as a whole a graceful health park that can be experienced. The design reflects the 'whole life cycle' concept, with a planned 'plug-in' modular layout of medical units that can grow with future needs.

赞助内容

探索 Designers.org 之外

发现来自我们广告合作伙伴的产品、服务和机会。

优秀设计值得卓越认可

A' 设计奖是一项国际性的专业评审荣誉,旨在表彰优秀设计。参加 A' 设计奖,获得凭实力赢得认可的机会,为您的作品赢得声誉、荣耀和曝光。提名您的作品参加 A' 设计奖,角逐令人瞩目的 A' 设计大奖。

立即提名