Mazmuna geç
Leva Engineering tarapyndan Kwsa Kinetik Diwar

Leva Engineering tarapyndan döredilen Kwsa Kinetik Diwar dizaýny Gurnama Dizaýny Bäsleşik Kategoriýasynda 2025 A' Design Award Kümüş Baýragy baýragynyň abraýly ýeňijisidir.


KümüşGurnama· 2025

Kwsa Kinetik Diwar

dizaýner: Leva Engineering

Müşderi: Leva Engineering

Gurnama Kategoriýasynda A' Design Award Kümüş Baýragy Ýeňijisi

30,958

Tassyklanan Baýrak Ýeňijisi

#172468 üçin Baýrak Ýagdaýyny Barlaň

Reňkler

Dizaýn

Kwsa Kinetik Diwar hakynda

Kwsa — Er-Riýad şäherindäki Aramco Innowasiýa Merkezinde ýerleşýän kinetik diwar instalýasiýasydyr. Bu eser 209 inedördül metr meýdany tutup, her biri 6000 mm inli we 7000 mm beýiklikdäki alty sany modully diwardan emele gelýär. Hereket, 0,1 mm takyklyk bilen ýörite hereketlendiriji wint we ryçag ulgamyny işledýän 20 000 sany ädimli motor arkaly döredilýär. Öz-özüni ýaglaýan tehnopolimerlerden ýasalan bölekler ýaglamany talap etmeýär we tehniki hyzmat üçin öň tarapdan elýeterliligi üpjün edýär. Horeografiýa edilen yzygiderlilikler çal reňkli wideodan döredilýär, onda ýagtylyk bahalary hereketiň derejesini kesgitleýär.

Ykrar etme

A' Design Award Kümüş Baýragy hakynda

Kwsa Kinetik Diwar A' Design Award Kümüş Baýragynyň ýeňijisidir; bu owadan, belent we täsirli ýokary derejeli dizaýnlara berilýän adatdan daşary abraýly ykrarnamadyr. Kümüş ýeňijileri dizaýnerleriniň ajaýyp bilimini, zehinini we ýiti aňyny görkezýän aşa ýalpyldawuk we örän döredijilikli eserlerdir. Kwsa Kinetik Diwar ajaýyp, nusgalyk, üns çekiji derejede hünärmenlikli we çuňňur täzelikçi eser bolmagy garaşylýar. A' Design Award Kümüş Baýragyny gazanan bu dizaýn sungatyň, ylmyň, dizaýnyň we tehnologiýanyň çäklerine peýda berýän we ony öňe sürýän örän üns çekiji, haýran galynýan oýlap tapyşdyr. Kwsa Kinetik Diwar köpüň gabanjyna sezewar bolýan, isleglerimizi oýarýan, oňyn duýgulary getirýän we haýranlyk we geň galmagy döredýän eserdir.

Dizaýnyň sahna arkasy

Metbugat toplumy

Dizaýner tarapyndan berlen kreditler, topar agzalary we tehniki maglumatlar.

Üýtgeşik Aýratynlyklar
Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
Ölçegler we Gaplama
Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required.
Bellikler
Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
Önümçilik Tehnologiýasy
The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
Dizaýn Kynçylygy
A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
Gözleg
This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
Ylham
The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
Taslama Dowamlylygy
The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024.
Iş Akymy
The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
Topar Agzalary
Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology

Hemaýatçy

Designers.org-dan Daşary Öwreniň

Mahabat hyzmatdaşlarymyzdan önümleri, hyzmatlary we mümkinçilikleri tapyň.

Oňat Dizaýn Uly Ykrar Edilmäge Mynasypdyr

A' Design Award — oňat dizaýn üçin halkara, eminler tarapyndan berilýän baýrakdyr. Işleriňiziň mynasyp ykrar edilmegini, şöhrat, abraý we köpçülige tanalmagy gazanmak üçin A' Design Award bäsleşigine gatnaşyň. Işiňizi A' Design Award üçin hödürläň we abraýly A' Design Prize baýragy ugrunda bäsleşiň.

Hödürle