Karya Star of Tomorrow Desain Interior Kantor ku Millton Yu nyaéta pamenang anu dihormat pisan tina 2021 A' Design Award Perunggu anu bergengsi dina Katégori Kompetisi Interior.
PerungguInterior· 2021
Star of Tomorrow Desain Interior Kantor
ku Millton Yu
Klién: M. INTERIOR DESIGN Co., LTD
Pamenang A' Design Award Perunggu dina Katégori Interior
Pamenang Panghargaan anu Diverifikasi
Verifikasi Status Panghargaan pikeun #123732Désain
Ngeunaan Star of Tomorrow Desain Interior Kantor
Star of Tomorrow nyaéta interior kantor anu didesain pikeun kantor puseur perusahaan di Taipei, Taiwan. Proyék anu lega-na 466 méter pasagi ieu ngawengku aula panyambungan, kelas dance, studio, aula ékshibisi multifungsi, kafe kadaharan hampang, sarta wewengkon sadérék pikeun tamu. Témbok jeung siling bodas kalayan lantai simén anu tetep aya téksturna asli méré tempat pikeun tampilan nu bakal datang. Rohangan rapat sarta wewengkon rékréasi bisa dirobah pikeun kaperluan lian ku cara mindahkeun parabot, ku kituna ngahindarkeun kabutuh ngawangun deui di kamudian poé. Témbok lengkung logam sarta pencahayaan jadi tanda asupna ka wewengkon kantor utama.
Pangakuan
Ngeunaan A' Design Award Perunggu
Star of Tomorrow Desain Interior Kantor mangrupa juara A' Design Award Perunggu, pangakuan anu pohara bergengsi anu dipasihkeun ka desain unggul anu dicirikeun ku kréativitas, kacerdikan jeung kawaspadaan. Para juara Perunggu téh artéfak anu lobaan kaahlian jeung kréatif pisan anu ngabuktikeun pangalaman anu lega, imajinasi jeung kacerdasan para désainerna. Star of Tomorrow Desain Interior Kantor diharepkeun jadi objék anu dihargaan, dikagumi jeung dipikanyaah anu profésional jeung inovatif. Desain juara A' Design Award Perunggu ieu ngalebetkeun prakték pangalusna dina seni, élmu, desain jeung téknologi, sarta unggul dina perhatian kana détail. Star of Tomorrow Desain Interior Kantor minuhan kabutuhan kalayan éndah, nyentuh kahayang, nyenangkeun rasa, jeung narik rasa panasaran.
Di Balik Désain
Kit Pers
Krédit, anggota tim sareng detil téknis anu disayogikeun ku désainer.
- Sipat Unik
- The client rented a building with eight floors above ground and two floors underground in the center of the city as the new corporate headquarters, and selected the team to plan and design space for it. In addition to office space, the main requirements also include entrance halls, dance classrooms, studios, multi-functional exhibition halls and light food cafes, as well as a rest space for VIPs, and many other functions.
- Diménsi & Bungkusan
- The project is 466 square meter.
- Tag
- Commercial, Headquarter, Interior Design, Space, Office
- Téknologi Produksi
- The team leaves a lot of white walls and ceilings in the lobby and multi-functional exhibition hall, and chooses the original texture cement floor to reserve the space and walls that can be used for future display, and it can also reserve in terms of functional conditions. The demand is to respond to the minimalist requirements in the design concept. In addition, meeting rooms and recreational spaces can be converted to other functions by moving furniture. Even if there is a possibility of a second construction change in the future, it can ensure that there is no need to dismantle and rebuild.
- Tantangan Desain
- The building was originally a residential plan, and the original layout and power supply and drainage configurations must be re-adjusted to suit the above spatial functions. In the limited decoration budget, the space design still needs to conform to the client's company image and brand style: fashionable, popular, elegant and bright. The final effect not only meets the above needs, but also conforms to the client's company image in style and beauty, and is also well controlled in terms of budget, achieving a balance between reasonable prices and design effects.
- Panalungtikan
- The early planning and design received strong support during the implementation. In order to modify the basis of the original residential configuration and ensure normal use in the later period, most of the cost was invested in the construction of basic conditions. The selected materials and construction methods minimize the need for reprocessing. Reduce manpower and resource consumption and save costs. Exposed pipelines and surface materials are accurate and step-by-step construction is required to be done at one time, and unnecessary on-site processing or polluting production processes are gradually reduced. Ensure that the completed space meets the requirements of environmental protection, cleanness and pollution-free, and immediate entry.
- Inspirasi
- In response to customers in a popular industry and changing market demands, there are new ideas to be produced at any time, so they need a relatively flexible space that can be adjusted at any time, reducing unnecessary and unchangeable decorations and furniture and saving budgets. Various popular elements that may be produced in the future retain the space for performance and performance.
- Durasi Proyék
- The project finished in June 2020 in Taipei, Taiwan.
- Alur Operasi
- Simple lines and materials, low chroma colors, methodical details and quality, comfortable and comfortable use, and the overall space presents an elegant temperament. Step out of the elevator and before entering the main office area, the cold metal arc walls and lights on both sides, with minimal decoration materials and design techniques, instantly transform the space into a fashionable extension table, opening up fashion for people entering this space journey of.
- Anggota Tim
- Designer: Millton Yu
- Krédit Gambar
- Image #1-5: Photographer Alvic Han, Star of Tomorrow, 2020.
Disponsoran
Jelajah Saluareun Designers.org
Panggihan produk, layanan sareng kasempetan ti mitra iklan urang.
Langkung Seueur Pikeun Dijajah
Désain Anu Patali
Jajah langkung seueur désain anu meunang panghargaan tina katégori anu sami, dipilih dumasar kana jasana.