Dhizaini Reconstruction in Pudong Shanghai Chivako Chechipatara naThad ndiye mukundi anokudzwa zvikuru wemubairo unoremekedza we2021 Mubairo weBronzi we A' Design Award muChikwata cheKukwikwidza cheAkitekicha, Zvivako neZvivakwa.
BronziAkitekicha· 2021
Reconstruction in Pudong Shanghai Chivako Chechipatara
na Thad
Mutengi: Architectural Design and Research Institute of Tsinghua University Co.,Ltd.
Mukundi weMubairo weBronzi we A' Design Award muChikwata cheAkitekicha
Mukundi weMubairo Akasimbiswa
Simbisa Mamiriro eMubairo we#121374Dhizaini
Nezvekwa Reconstruction in Pudong Shanghai Chivako Chechipatara
Kuvakwazve muPudong Shanghai kuvakwazve nekuwedzera kwechivakwa chinosanganisira kuongororwa kwevarwere vasingarari nezvekurapa nekukurumidza (outpatient uye emergency medical technology complex) pachipatara chehurumende muShanghai, China. Dhizaini iyi inosanganisa kuvakwa kutsva nekuoma kwekuvakazve nzvimbo iri kushanda. Basa iri rakakamurwa muzvikamu zvina: kubvisa (demolition), kuchinjana (transition), kuvakazve (reconstruction) uye kudzorera (restoration). Zvivakwa zvenguva pfupi uye zvivakwa zvakachinjwa zvinobatsira kuti masevhisi ekurapa arambe achishanda panguva yechikamu chekuchinjana. Chiso chechivako chinoshandisa mapaneri machena eanoumbwa nesimbi inonzi aluminium (white aluminum panels), pamwe nemapaneri eanoumbwa nesimbi ane muonero wehuni pamakona (wood grain aluminum panels), uye mahwindo anosvika pasi kusvika padenga (floor-to-ceiling windows).
Kuzivikanwa
Nezve Mubairo weBronzi we A' Design Award
Mubairo weBronzi we A' Design Award wakahwinwa ne Reconstruction in Pudong Shanghai Chivako Chechipatara, rukudzo rwakakwirira kwazvo runopiwa kumadhizaini akasiyana anozivikanwa nekugadzira, njere nekungwara. Vakunda veBronzi mabasa ane unyanzvi hwakakwana uye kugadzira kunoshamisa kunosimbisa ruzivo rukuru, pfungwa nehunyanzvi hwevagadziri vawo. Reconstruction in Pudong Shanghai Chivako Chechipatara inotarisirwa kuva chinhu chinokudzwa kwazvo, chinoremekedzwa uye chinodiwa, chine hunyanzvi hunoonekwa uye zvitsva. Dhizaini iyi yakahwina Mubairo weBronzi we A' Design Award inosanganisa maitiro akanakisa muhunyanzvi, sayenzi, dhizaini netekinoroji uye yakasiyana nekutarisisa zvidiki. Reconstruction in Pudong Shanghai Chivako Chechipatara inogutsa zvinodiwa zvakanaka, inobata zvishuvo, inokwezva manzwiro uye inomutsa kuda kuziva.
Shure kweDhizaini
Bepa Renhau
Zvikwereti, nhengo dzetiimu nezvimwe zvakadzama zvakapihwa nemudhizaina.
- Hunhu Hwakasiyana
- This project is reconstruction and expansion project of the outpatient and emergency medical Technology complex building of the People's Hospital in Pudong New District, Shanghai, China.It has the modernity of new buildings and the complexity of reconstruction and expansion. The generation of the building is post-occupancy evaluation combined with Chinese traditional Yin-Yang theory.
- Kukura & Kupakiwa
- the project is with buildings scale of 135,357 square meters and an area of 45,108.7 square meters
- Matagi
- Architecture, Design, Hospital, Reconstruction, Restoration
- Tekinoroji Yekugadzira
- The facade of the building is made of 2 kinds of aluminum plate. Mainly uses white aluminum. In the conner of the facades, architects use wood grain aluminum plate. Floor-to-ceiling windows are widely used by the new building.
- Changamire yeDhizaini
- Transition project stage: In order to demolish the existing buildings in the new building land, the form of temporary turnover needs to be adopted. Architects transformed function of office buildings and wards to outpatient units. In order to meet the needs of normal business development during the transition period, 3,200 square meters of temporary buildings were built and 13,199 square meters of existing buildings were integrated and transformed. Restoration and renovation project stage: demolish the science and education building, dormitory building, Meixian building, ground machinery garage, activity center (canteen), east gate guard, garbage room, etc. on the red line of the transition project site; demolish the temporarily built outpatient building in the site.
- Tsvakurudzo
- Due to the particularity of the reconstruction and expansion projects, it is necessary to conduct an in-depth post-occupancy evaluation of the existing functions and environment.Due to the particularity of the hospital building, it is necessary to adopt systematic concepts and methods. The hospital building includes three basic processes of human flow, logistics, and information flow. From the overall planning and single plan design, specific analysis should be made for different types of human flow and logistics according to the difficulties of hospital construction. Architects decided to Step-by-step implementation of construction, Demolition-Transition-Reconstruction-Restoration.
- Chikurudziro
- In order to build a large-scale modern hospital in China, the project reconstructs and expanses an outpatient and emergency medical technology complex building. Design adjusted functional optimization overall of the new and old buildings to achieve four design goals: Change the current existing traffic system and functional process problems; Build the hospital's aortic traffic; Strengthen the positioning and construction of key departments; improve the hospital environment and quality.
- Nguva yePurojekiti
- The project started in May 2018 and will be finished in 2025 in Shanghai, China.
- Mafambiro eBasa
- The hospital is operated by the government. Due to the outdated construction facilities of the outpatient building and medical technology building, and insufficient functional space, the medical process cannot meet the service demand. The architects carried out the reconstruction and expansion of the outpatient and emergency medical technology complex building on the basis of the demolition of the existing outpatient building, medical technology building and other old buildings in the People's Hospital of Pudong New Area.
- Nhengo dzeTimu
- Yao Hong, Fu Liewu, Li Fei, Wang Xiaohan, Cai Zhengqiang, Jin Cheng, Meng Xianghao, Zhang Lan, Hu Bo
- Zvikwereti zveMifananidzo
- Image #1: Architectural Design & Research Institute Tsinghua University, Beijing, 2021.
Image #2: Architectural Design & Research Institute Tsinghua University, Beijing, 2021.
Image #3: Architectural Design & Research Institute Tsinghua University, Beijing, 2021.
Image #4: Architectural Design & Research Institute Tsinghua University, Beijing, 2021.
Image #5: Architectural Design & Research Institute Tsinghua University, Beijing, 2021.
Yakatsigirwa
Ongorora Kupfuura Designers.org
Wana zvigadzirwa, masevhisi nemikana kubva kuvatengesi vedu vekushambadza.
Zvimwe Zvekuongorora
Dhizaini Dzakafanana
Ongorora dzimwe dhizaini dzakawana mibairo kubva mudunhu rimwe chete, dzakasarudzwa nekuda kwehunhu hwadzo.