Id-disinn Imatra GIS Sottostazzjoni tal-Elettriku minn Virkkunen and Co Architects huwa rebbieħ stmat ħafna tal-prestiġjuż 2021 Premju A' Design Award tal-Fidda fil-Kategorija tal-Kompetizzjoni ta' Disinn tal-Arkitettura, Bini u Strutturi.
FiddaArkitettura· 2021
Imatra GIS Sottostazzjoni tal-Elettriku
minn Virkkunen and Co Architects
Klijent: Virkkunen & Co Architects
Rebbieħ tal-Premju A' Design Award tal-Fidda fil-Kategorija ta' Arkitettura
Rebbieħ ta' Premju Ivverifikat
Ivverifika l-Istatus tal-Premju għal #120944Id-Disinn
Dwar Imatra GIS Sottostazzjoni tal-Elettriku
Imatra GIS hija sottostazzjoni tal-elettriku mibnija fil-pajsaġġ tal-widien tal-Imatrankoski fil-Lvant tal-Finlandja. Il-proġett jinkludi bini ta' sottostazzjoni u ħames pilastri tal-enerġija u terminali. Il-bini għandu qafas tal-konkrit u faċċati b'saff doppju. Is-saff ta' barra huwa magħmul minn briks twal maħduma bl-idejn imqiegħda f'profil ziggużag u sostnut minn qafas tal-azzar. L-istrutturi tat-trasmissjoni huma magħmula minn profili tal-azzar iwweldjati trijangolari. Id-disinn ikisser aspetti tal-kuntest mibni u jerġa' jibni l-elementi f'forma astratta ġdida, f'bilanċ mal-pajsaġġ tal-madwar.
Ir-Rikonoxximent
Dwar il-Premju A' Design Award tal-Fidda
Imatra GIS Sottostazzjoni tal-Elettriku huwa rebbieħ tal-Premju A' Design Award tal-Fidda, rikonoxximent prestiġjuż straordinarjament mogħti lil disinji tal-ogħla livell, sbieħ u impressjonanti. Ir-rebbieħa tal-Fidda huma xogħlijiet brillanti ħafna u kreattivi ħafna li juru l-għarfien espert, it-talent u l-aċċuratezza tad-disinjaturi tagħhom. Huwa mistenni li Imatra GIS Sottostazzjoni tal-Elettriku ikun xogħol mill-isbaħ, eżemplari, professjonali ħafna u innovattiv bil-fond. Dan id-disinn rebbieħ tal-Fidda huwa invenzjoni notevoli u mammirata li tikkontribwixxi biex jitwessgħu l-fruntieri tal-arti, ix-xjenza, id-disinn u t-teknoloġija. Imatra GIS Sottostazzjoni tal-Elettriku huwa ħolqien li ħafna jinvidjawh, li jqajjem ix-xewqat, iġib sentimenti pożittivi u joħloq tgħaġġib u mistagħġib.
Wara d-Disinn
Kit għall-Istampa
Krediti, membri tat-tim u dettalji tekniċi pprovduti mid-disinjatur.
- Proprjetajiet Uniċi
- The project is composed of an electricity substation building and an array of five designer power pylons and terminals, set in the national landscape of Imatrankoski rapids in Eastern Finland. The new structures were designed to be in balance with the surrounding landscape. Their design breaks apart aspects of the built context and reassembles them in a new abstracted form. A combination of hand-made and industrial materials and structures is used to achieve this.
- Dimensjonijiet u Ippakkjar
- The substation building floor area: 965 sqm. Length x width x height of the building 44,1 m x 13,2 m x 8,1 m.
- Tikketti
- infrastructure, architecture, landscape, electricity substation, transmission, power line, brick, concrete, steel
- Teknoloġija tal-Produzzjoni
- The substation building has a concrete frame and double-skin facades. The outermost facade layer consists of hand-made long bricks laid in a zig-zag profile. The brick cladding is supported by a steel frame fixed to the inner concrete facades. The concrete structure consists of pre-fabricated and in-situ parts. The transmission structures are made of triangular welded steel profiles. They consist of workshop-made, coated pre-fabricated sections assembled and erected on the site without welding.
- Sfida tad-Disinn
- The main challenge was architectural rather than technical, due to the qualities of the surrounding landscape and the history of the area. Visual and structural coherence of the distinct parts and general sensitivity to the context were methods for overcoming this challenge. We arrived at the final design through a process of elimination. Dozens of prototype 3D models were evaluated for impact in a detailed and accurate site model based on an extensive point-cloud data set of the area.
- Riċerka
- We used site visits and literature sources for determining visual and historical factors that would most influence and serve the design. Literature about the history of the landscape, tourism, architecture, and industry in the area was used. The finding that had the most impact on the design was based on the analysis of the external architecture of the old hydropower plant: the rhythm of the facade openings, and the materials used in the buildings.
- Ispirazzjoni
- The beautiful landscape and the historical significance of the area were the primary sources of inspiration for us. The existing, impressive industrial architecture of the context was another major factor in the design. The guiding principle has been that the new structures should form a clearly defined new historical layer. They would also have to be timeless and combine harmoniously with the context. We sought to further elevate the beauty of the site.
- Tul tal-Proġett
- Project completed: 2020
Location: Imatra, Finland - Fluss tal-Operazzjoni
- Imatra electricity substation and the transmission structures are not fenced off from the surroundings and they can be approached freely. The substation is an unmanned facility that is mainly remote-controlled from a central control room located off-site. It is visited regularly for inspection and maintenance purposes by trained personnel. In the main process equipment room, the users control the switchgear equipment on a workstation designed for this purpose.
- Membri tat-Tim
- Tuomas Kivinen
Anna Blomqvist
Maria Karjalainen - Krediti tal-Immaġni
- Image #1: Photographer Tuomas Kivinen, 2020.
Image #2: Photographer Tuomas Kivinen, 2021.
Image #3: Photographer Tuomas Kivinen, 2020.
Image #4: Photographer Tuomas Kivinen, 2021.
Image #5: Photographer Tuomas Kivinen, 2021.
Sponsorjat
Esplora Lil Hinn minn Designers.org
Skopri prodotti, servizzi u opportunitajiet mis-sħab tar-reklamar tagħna.
Aktar x'Tesplora
Disinni Relatati
Esplora aktar disinni rebbieħa mill-istess kategorija, magħżula skont il-mertu.