Opus The Courtyard Spatium Recreationis a designatore Nischal Abhaykumar est victor maxime honoratus praemii praestigiosissimi 2019 Praemium A' Design Award Aeneum in Categoria Certaminis Architectura.
AesArchitectura· 2019
The Courtyard Spatium Recreationis
Cliens: M9 Design Studio
Victor praemii Praemium A' Design Award Aeneum in Categoria Architectura
Victor Praemii Verificatus
Verifica Statum Praemii pro #76233Designum
De The Courtyard Spatium Recreationis
Atrium est aedificium ad otium et eventus destinatum, communitatis conventibus excogitatum. Structura duorum tabulatorum forma rectangula est, tecto plano, parietibus e metallo undulato et compage ex ferro molli. Frons e polycarbonato undulato spatium eventuum multiplicis usus in primo tabulato includit lucemque naturalem in interiora infert. Vela textu insignita frontem ornant ut lux in spectaculis moderetur. Intus, tigna ferrea nigro colore picta, lacunaria ex laminis nudatis et pavimenta ex cemento lignoque visibilia relinquuntur. Partes serie magna fabricatae sumptum minorem servaverunt et tempus aedificandi ad septuaginta quinque dies redegerunt.
Agnitio
De Praemium A' Design Award Aeneum
The Courtyard Spatium Recreationis victor est Praemii A' Design Award Aeneum, honoris multum aestimati formis egregiis, creandi ingenio, sollertia et acumine insignibus dati. Victores Aenei opera perita et mire creandi sunt, quae experientiam, imaginationem et solertiam auctorum suorum confirmant. Exspectatur The Courtyard Spatium Recreationis rem multum aestimatam, admiratam et carissimam, notabiliter professionalem et novam fore. Haec forma Aeneo victa optimas consuetudines artis, scientiae, formandi rationis et technologiae amplectitur et in cura minutiarum excellit. The Courtyard Spatium Recreationis necessitates egregie explet, cupiditates tangit, sensus capit et curiositatem allicit.
Post Designum
Fasciculus Nuntii
Merita, sodales gregis et singula technica a designatore praebita.
- Proprietates Singulares
- The aim was to create a unique building using mass-produced components – cheap price and with short execution timeline. Rectangular in plan, the two-storey building features a flat roof, corrugated metal walls and a mild steel frame. Corrugated polycarbonate sheet facade encases the multi-purpose event space on the first floor. Thin and translucent material is used to replace the regular exterior walls, where natural light can be maximised in the interior space.
- Dimensiones et Involucrum
- Built-up area - 3500 sqft. (New building only)
Site area - 6000 sqft. - Notulae
- Adaptive re-use, modern, industrial, old and new, polycarbonate box
- Technologia Productionis
- A steel structure made up of I-beams is on show inside the building and has been painted black. Deck sheet ceilings are left exposed, while the floors encompass a mixture of concrete and timber.
- Provocatio Designandi
- The designated space earlier comprised of a single two-storey building along with a courtyard, set in the client’s grandparents’ house. It is almost a 50-year-old residence along with a garden café that was utilised for events. In the absence of a dedicated space for various functions, the setting of the space was informal and could not generate much revenue. In order to fill the gaps in the existing design, a new structure was introduced and made sure that it would not overpower the older one in height or by use of materials.
- Investigatio
- Public space is and has been an integral part of communities, serves as a location for people to meet, relax and exchange ideas - refreshment of ones mind or body after work that amuses or stimulates. Informal open recreational space is that which provides opportunities for more passive recreational pursuits. It may also have a scope for informal play. Participation in recreation is regarded as being essential in contributing to people's well being.
- Inspiratio
- The site previously formed part of the garden of a house occupied by the clients' grandparents. The design of the new building was intended to minimise its impact on this existing house, both during and after its construction. A desire to maintain a connection with the existing house informed the decision to keepas much of the existing garden area as possible, and to position the entrance to the new building so it opens onto this space.
- Duratio Operis
- The building was completed in June 2018 and the duration of construction was 75 days.
- Cursus Operationis
- The inside of this polycarbonate sheet facade is lined by rich textured drapes to control the amount of natural light inside during specific shows and events. Windows are made from the same material as the walls, so they don't offer any additional light but can be opened to let fresh air into the building. At night, lights glowing from within transform the building into a huge light-box along the streetscape.
- Membra Turmae
- Nischal Abhaykumar
Jesal Pathak
Preethi B Raju
Karamveer Singh - Agnitiones Imaginum
- Shamanth Patil Photography
Patrocinatum
Explora Ultra Designers.org
Inveni producta, servitia et occasiones a sociis nostris publicitariis.
Plura Exploranda
Designa Cognata
Explora plura designa praemio ornata ex eadem categoria, merito selecta.