Ɛeddi ɣer ugbur
The Courtyard Amkan n Zzhu sɣur Nischal Abhaykumar

The Courtyard Amkan n Zzhu sɣur Nischal Abhaykumar d anerbaz yettwaqadren meqqren n 2019 Tarbaḥt A' Design Award n Lbrunz deg Taggayt n Tnaflit n Afeṣṣel n Tansekta, Lebni d Teɣssa.


LbrunzTansekta· 2019

The Courtyard Amkan n Zzhu

sɣur Nischal Abhaykumar

Amsaɣ: M9 Design Studio

Anerbaz n Tarbaḥt A' Design Award n Lbrunz deg Taggayt n Tansekta

14,095

Anerbaz n Urraz Yettwasenqden

Senqed Addad n Urraz i #76233

Initen

Afeṣṣel

Ɣef The Courtyard Amkan n Zzhu

Lḥuc d asensu ilaqen i tejmuɛin d yimeɣnasen n temɣiwant. Abna-agi n sin iɣezdisen d aɛrurin deg uskan, s ssqef aflaḍan, iɣallen n uzzal iṛeẓẓuḍen d lḥila n uzzal aqjiḍan. Adamsu n ubulikarbunat aṛeẓẓuḍen izzuɣer amkan aɛeddaw n twuriwin s waṭas n tesɣunin ɣef tewsatin tamezwarut, yerna d asirag n tafat tabaḍnit ɣer daxel. Ileɣman s uskan yeṭṭfen deg udamsu i uḥader n tafat deg wakud n yimeslayen. Deg daxel, timerdiwin n uzzal yettwaskanen s uzegzaw aberkan, ssqef n tqecwalt n uskan yellan d aẓrayan, akked wedaf n uẓekka d ttesɣunin i mazal-iten banen s wallen. Ifergan yettwaxedmen s waṭas ttwaxedmen (mass-produced) squcen deg wazal n tsertit ɣer wadda, squcen daɣen deg wakud n usebni ɣer 75 wussan.

Asmekti

Ɣef Tarbaḥt A' Design Award n Lbrunz

The Courtyard Amkan n Zzhu d amerbaḥ n Tarbaḥt A' Design Award n Lbrunz, tagmat ɛlayen i yisnulfa yelhan, yeṭṭafaren tinawt, tamusni d tezmert. Imerbaḥen n Lbrunz d isnulfa yelhan, ttbanen d timusniwin n tmusni n yimahilen-nsen. The Courtyard Amkan n Zzhu ad yili d asnulfu yettwaɛezzen, yelhan, amaynut. The Courtyard Amkan n Zzhu yettemlil ɣef yimawlan, yettwaɛezzen s tmahilt-is.

Deffir n ufeṣṣel

Tagrurt n tɣamsa

Ismawen n terbaɛt, iferdisen itiknikanen akked telɣut i d-yefka umeṣṣufeɣ.

Taɣara Tasuft
The aim was to create a unique building using mass-produced components – cheap price and with short execution timeline. Rectangular in plan, the two-storey building features a flat roof, corrugated metal walls and a mild steel frame. Corrugated polycarbonate sheet facade encases the multi-purpose event space on the first floor. Thin and translucent material is used to replace the regular exterior walls, where natural light can be maximised in the interior space.
Tigejdiwin & Akemmus
Built-up area - 3500 sqft. (New building only)
Site area - 6000 sqft.
Tibzimin
Adaptive re-use, modern, industrial, old and new, polycarbonate box
Tasnakta n Ufares
A steel structure made up of I-beams is on show inside the building and has been painted black. Deck sheet ceilings are left exposed, while the floors encompass a mixture of concrete and timber.
Asewḥel n Usnulfu
The designated space earlier comprised of a single two-storey building along with a courtyard, set in the client’s grandparents’ house. It is almost a 50-year-old residence along with a garden café that was utilised for events. In the absence of a dedicated space for various functions, the setting of the space was informal and could not generate much revenue. In order to fill the gaps in the existing design, a new structure was introduced and made sure that it would not overpower the older one in height or by use of materials.
Anadi
Public space is and has been an integral part of communities, serves as a location for people to meet, relax and exchange ideas - refreshment of ones mind or body after work that amuses or stimulates. Informal open recreational space is that which provides opportunities for more passive recreational pursuits. It may also have a scope for informal play. Participation in recreation is regarded as being essential in contributing to people's well being.
Aseḥbiber
The site previously formed part of the garden of a house occupied by the clients' grandparents. The design of the new building was intended to minimise its impact on this existing house, both during and after its construction. A desire to maintain a connection with the existing house informed the decision to keepas much of the existing garden area as possible, and to position the entrance to the new building so it opens onto this space.
Tanzagt n Usenfar
The building was completed in June 2018 and the duration of construction was 75 days.
Tanila n Umahil
The inside of this polycarbonate sheet facade is lined by rich textured drapes to control the amount of natural light inside during specific shows and events. Windows are made from the same material as the walls, so they don't offer any additional light but can be opened to let fresh air into the building. At night, lights glowing from within transform the building into a huge light-box along the streetscape.
Igmamen n Terbaɛt
Nischal Abhaykumar
Jesal Pathak
Preethi B Raju
Karamveer Singh
Imsuren n Tugniwin
Shamanth Patil Photography

Yettwaxellṣen

Snirem Seld Designers.org

Af-d iferdisen, imeẓla d tegnatin sɣur yimɛawnen-nneɣ n usissen.

Asnulfu Yelhan Yesra Asekṛes Ameqqran

Arraz A' n Usnulfu d arraz agraɣlan, yettusneqden sɣur uɣref, i usnulfu yelhan. Ttekki deg Urraz A' n Usnulfu akken ad tesɛuḍ tagnit n usekṛes imeritukratik, ad tawiḍ aẓayer, ameqqer d usissen i umahil-ik. Sumer amahil-ik i Urraz A' n Usnulfu akken ad tnafseḍ s Ulamek A' n Usnulfu.

Sumer