Ɛeddi ɣer ugbur
Aida Sekkei Precut Taṣennaɛt sɣur Nobuaki Miyashita

Aida Sekkei Precut Taṣennaɛt sɣur Nobuaki Miyashita d anerbaz yettwaqadren meqqren n 2024 Tarbaḥt A' Design Award n Ddheb deg Taggayt n Tnaflit n Afeṣṣel n Tansekta, Lebni d Teɣssa.


DdhebTansekta· 2024

Aida Sekkei Precut Taṣennaɛt

sɣur Nobuaki Miyashita

Amsaɣ: Aida Sekkei Co., Ltd.

Anerbaz n Tarbaḥt A' Design Award n Ddheb deg Taggayt n Tansekta

150,107

Anerbaz n Urraz Yettwasenqden

Senqed Addad n Urraz i #160159

Initen

Afeṣṣel

Ɣef Aida Sekkei Precut Taṣennaɛt

Aɣawas amaynut n tṣennaɛt n Aida Sekkei yettaleḥ ɣef uqesṣer uqbel n useklu. Takti-nnes tettmagar-d ɣef tmerna n tesnelfat i yessemmal amazray n usesfer n useklu. Deg-s yella webrid n tunigin yettali, yettwaḥṣaren s ukaram, s teɣzi n wazal n 100 n lmitrat deg tṣennaɛt, yettwafeṣṣel i yinebgawen akken ad muqlen s telqayt tarrayt tummidt n uqesṣer uqbel. Lbinaya n yideftaren tettawi-d tallunin timeqqranin s tiqfilin i d-yettwaggen s tiṣenfaṛin s tama tacebḥant, i yettusqedcen s waṭas d tiṣenfaṛin tisnaqisin deg izuran n useklu. Afeṣṣel yesdukkul meṛṛa iferdisen akken ad yernu taṣennaɛt n umal, yesseḥbibiṛ tannezrut d cciṭṭma tajmilin deg yal aḥric.

Asmekti

Ɣef Tarbaḥt A' Design Award n Ddheb

Aida Sekkei Precut Taṣennaɛt d amerbaḥ n Tarbaḥt A' Design Award n Ddheb, tagmat tuffirt i yisnulfa n umezwaru yelhan s waṭas. Imerbaḥen n Ddheb d isnulfa d imaynuten d imeqqranen. Aida Sekkei Precut Taṣennaɛt ad d-yefk lqima ur nesɛi amgarad, ad yeǧǧ ddunit tennuɣ.

Deffir n ufeṣṣel

Tagrurt n tɣamsa

Ismawen n terbaɛt, iferdisen itiknikanen akked telɣut i d-yefka umeṣṣufeɣ.

Taɣara Tasuft
This is a project of a new timber processing plant for precut lumber. Its design concept is all about creating an architecture that embodies the series of timber processing. The almost 100-meter-long viewing aisle encased in a random stripe wooden shell is cantilevered and appears as if it floats from the factory building wall. The aim of the impressive façade design with a sense of acceleration and speed is to provoke the image of Aida Sekkei’s further evolution towards the future.
Tigejdiwin & Akemmus
Site area: 40,023.50 m2
Building area: 14,614.43 m2
Total floor area: 15,206.32 m2

Office Building(2F)
1st floor: 458.21 m2
2nd floor: 429.28 m2
Number of floors: 2 above ground
Height: Maximum height 10.86 m,
Structure: Wooden

Factory Building(2F)
1st floor: 13,886.39 m2
2nd floor: 380.70 m2
Tibzimin
architecture, factory, wooden, truss, pre-cut, Factory tour, Japan
Tasnakta n Ufares
As for the office, which is the face of the plant, we created one large space by building a scissor truss using members of smaller cross sections (30 mm by 120mm size lumber used as supplementary members such as wall studs of a home). 120mm square Japanese cypress pillars are placed every 303 mm of the wall and to construct load-bearing walls, a 30 mm thick cedar board was inserted between the pillars.
Asewḥel n Usnulfu
When constructing large-span wooden structures, it's common to use specialized and expensive materials such as large-diameter engineered lumber. However, here, we've achieved a 12-meter span at low cost by combining small-section studs commonly used in typical residential construction to form trusses. This method, the first of its kind in Japan, utilizes these small-section studs (measuring 30×120mm) which are widely used in residential construction.
Anadi
Research Objective: To find a cost-effective method for achieving large spans in wooden structures. Result: The combination of small-section studs into truss structures has enabled the realization of a 12-meter span at low cost. Impact: There is potential for innovative approaches in medium to large-scale wooden construction.
Aseḥbiber
Before initiating this design, visiting an existing pre-cut factory left a profound impression. Witnessing the precise, aesthetically pleasing fabrication of columns and beams at remarkable speed sparked inspiration. To capture the dynamism and speed of fabrication observed in the factory, the design concept emerged: a facade featuring a protruding massive timber symbolizing the factory's essence.
Tanzagt n Usenfar
This project was completed in September 2020 and is currently in operation. The planned site in Bando City is a place where forest resources are abundant despite being near Tokyo. It is conveniently located as a node of the expressway network in the Tokyo metropolitan area.
Tanila n Umahil
This is a project of a new timber processing plant for precut lumber designed by Aida Sekkei Co.,Ltd., one of the leading house builders who specializes in traditional Japanese timber construction.
Ibrivan
None
Imsuren n Tugniwin
Image #1-#5: Photographer Nobuaki Miyashita, Variations, 2020

Yettwaxellṣen

Snirem Seld Designers.org

Af-d iferdisen, imeẓla d tegnatin sɣur yimɛawnen-nneɣ n usissen.

Asnulfu Yelhan Yesra Asekṛes Ameqqran

Arraz A' n Usnulfu d arraz agraɣlan, yettusneqden sɣur uɣref, i usnulfu yelhan. Ttekki deg Urraz A' n Usnulfu akken ad tesɛuḍ tagnit n usekṛes imeritukratik, ad tawiḍ aẓayer, ameqqer d usissen i umahil-ik. Sumer amahil-ik i Urraz A' n Usnulfu akken ad tnafseḍ s Ulamek A' n Usnulfu.

Sumer