Ferro Architettura · 2021
Sepanta Sala multifunzionale
by Amin Naeimi
- A' Design Award di Ferro 2021 in Architettura
- CLIENT: Excelsior grand resort hotel in Kish Island(Sepanta Gasht Kish Co.)
- Estimated Number of Design Views: 11,704
- Verification code CC45B06EA5 · Verify this award
Colors
About Sepanta Sala multifunzionale
Sepanta è una sala multifunzionale progettata per musica, teatro e opera sull'isola di Kish. La forma si ispira ai gusci delle tartarughe che nidificano lungo la costa vicina. Una superficie liscia e ondulata richiama le onde dell'oceano ed è realizzata in calcestruzzo fibrorinforzato con fibre di vetro. Il soffitto curvo sospeso è costruito con strutture reticolari spaziali e poggia su una facciata continua in vetro che apre gli interni alla vista sul mare. Il triplo vetro e il soffitto a tre strati riducono le dispersioni energetiche. La sala si estende su quasi 6000 metri quadrati e ospita circa 1350 persone.
About the A' Design Award di Ferro
Sepanta Sala multifunzionale ha vinto l'A' Design Award di Ferro, un riconoscimento prestigioso conferito a buoni design che soddisfano i requisiti professionali e industriali attesi da creazioni ben progettate. I vincitori di Ferro dimostrano la grande abilità, l'elevata specializzazione, la comprensione esperta e la capacità creativa dei loro creatori. Ci si aspetta che Sepanta Sala multifunzionale sia una creazione molto apprezzata, ammirata e amata, pratica e innovativa. Questo design vincitore dell'A' Design Award di Ferro integra le migliori pratiche del settore e ha caratteristiche tecniche competenti legate a know-how e talento. Sepanta Sala multifunzionale è rispettato per la sua accuratezza ed è progettato per offrire miglioramenti della qualità della vita che aiutano a rendere il mondo un posto migliore.
Press Kit
- Unique Properties
- This multifunctional hall designed for music, theater and opera, the three most importance feature we can mention are , eye-catching forms of tortoise shells near the beach with special night lighting, We create a special modern form with suspended curved ceiling, which is laying over the glass curtain wall that gave us the benefit of the perfect ocean view, the most stunning aspect of this design is the smooth wavy surface which is completely associate with ocean wave.
- Dimensions & Packaging
- The capacity of almost 1350 person and the survey is nearly 6000 square meters.
- Tags
- Sepanta opera hall,kish,kish opera hall
- Production Technology
- The most important challenge for the construction of this hall is the suspended celling which is done with space structures and the smooth wavy surface is made of GFRC . In consider of the importance of energy conservation we provide triple glazed curtain wall which is the best choice for this climate and three layers celling to reduce waste of energy.
- Design Challenge
- The most difficult challenge we faced in this project was limitation as a result of turtles habitat which is located neighboring to our site and the untouched and special environment which should be stay as undamaged as we can.
- Research
- When this project was referred to us, first of all, the environmental survey and research about the land on where this project is to be started began, and we came to interesting results in terms of environment and climate. The land was located near the coastal area. It was a spawning ground for rare turtles that were under environmental protection and also one of the most attractive and oldest inhabitants of the island, so we decided that the design would ultimately be inspired by these amazing creatures and be in harmony with the environment but a modern and architectural interpretation of turtles.
- Inspiration
- first of all turtles are the main species in Kish and they are preserve by the authority. This hall is an great symbol of these animals which is located near to their habitat however permissible limitation is intended, the design is inspired by the tortoise form and it has been tried to be a modern type of it.
- Project Duration
- The design of this project started on November 12, 2020 and was completed after three months, and its executive operation started on February 14, 2021, and the project plan for its completion is 18 months.