Hönnunarverkið Pugongshan Geology Safn eftir Baofeng Li er hávirt verðlaunaverk sem hlaut hin virtu 2022 A' Design Award í silfri verðlaun í keppnisflokknum Arkitektúr, bygginga- og mannvirkjahönnun.


SilfurArkitektúr· 2022

Pugongshan Geology Safn

eftir Baofeng Li

Viðskiptavinur: School of Architecture and Urban Planning

Handhafi A' Design Award í silfri í flokknum Arkitektúr

23,814

Litir

Hönnunin

Um Pugongshan Geology Safn

Pugong Mountain jarðfræðisafnið samþættir gamla og nýja gifsofnana og notar gamla ofnhópinn sem kennileiti hlið alls staðargarðsins. Ofnhausnum er breytt í útsýnispallur og er einn af gömlu ofnunum notaður sem aðalinngangur safnsins. Lykilnámusvæði eru sett upp sem vistfræðilegir fræðslustaðir og útsýnisgluggar og útsýnispallar eru settir upp á samsvarandi stöðum safnhússins þannig að safnhúsið er þétt fest á þessum sérstaka stað.

Viðurkenningin

Um A' Design Award í silfri

Pugongshan Geology Safn vann A' Design Award í silfri, gífurlega virta viðurkenningu sem veitt er hönnunarverkum í fremstu röð, stórfallegum og áhrifamiklum. Sigurvegarar í silfri eru ákaflega snjöll og afar skapandi verk sem sýna framúrskarandi sérfræðiþekkingu, hæfileika og skarpskyggni hönnuða sinna. Þess er vænst að Pugongshan Geology Safn sé dásamlegt sýningarverk sem er einstaklega fagmannlegt og djúpt nýstárlegt. Þetta hönnunarverk sem vann A' Design Award í silfri er mjög athyglisverð, dáð uppfinning sem gagnast og færir mörk listar, vísinda, hönnunar og tækni fram á við. Pugongshan Geology Safn er mjög öfunduð sköpun sem vekur langanir, færir jákvæðar tilfinningar og kveikir undrun og aðdáun.

Á bak við hönnunina

Fjölmiðlapakki

Heimildir, hópmeðlimir og tæknilegar upplýsingar frá hönnuðinum.

Einstakar eiginleikar
Pugong Mountain in Henan Province is a limestone mountain. Local residents built hundreds of small lime kilns to produce lime and get rich quickly, but the environment was severely damaged. The site is now abandoned.
In order to promote the concept of sustainable development, we designed the museum by transforming the kiln head into a viewing platform, and using one of the old kilns as the main entrance of the museum, making the mine, the old gypsum kiln and the new museum an organic whole.
Stærðir og umbúðir
The museum has 4 floors, divided into 1 underground floor and 3 above ground floors, with a height of 13.5 m, a land area of 14,159.5 square meters, and a total construction area of 3,314.5 square meters.
Merki
Museum, Combination of old and new, Ecological Education, Recycled Materials, Spirit of Place, Modest Construction
Framleiðslutækni
The building is constructed by local workers, some of whom are descendants of the lime kilns built in the past. We used the most common local technology to build this museum. The building skin is recycled from discarded concrete, with human-scale textured hanging panels, emphasizing the architectural The affinity with people also emphasizes the environmental protection significance of using recycled materials.
Hönnunaráskorun
There are two challenges in this project: 1. The owner thinks it is unnecessary to keep these dilapidated lime kilns, the owner thinks they are ugly, and they have to spend more money to strengthen them for the safety of tourists; 2. Compared with the model of simply building new houses, The model of merging old and new buildings presents design and construction challenges.
Rannsóknir
The Geological Museum mainly displays the production process of lime and the destruction of the ecological environment caused by the disorderly production of lime, and plays a role in popularizing scientific knowledge of lime and ecological education.
We set several key mining areas in the original mining area as ecological education points, and set viewing windows and viewing platforms at the corresponding positions of the museum building, so that the museum building is tightly anchored in this special place.
Innblástur
The jagged stone hills and huge mine pits are a meaningful ecological education place in themselves, because the existing lime kilns are tools for people to make money and destroy the environment. Therefore, the inspiration came from the experience of going to the site for the first time: we persuaded the owner to keep part of the incomplete mountain, the mine pit and all the lime kilns. Our design strives to make these site elements become part of the museum and anchor them in the site.
Lengd verkefnis
The design of the project began in 2018 and was completed in 2020 in Pugong Mountain,Xixian County,Henan Province,China.
Verkflæði
In order to carry forward the concept of sustainable development, we combined the new museum with the existing lime kiln, using uncalcined limestone as a landscape element, using the continuous old kiln group as the iconic gate of the geopark, and the kiln roof was transformed into a viewing platform . In order to highlight the old lime kiln, we deliberately weakened the shape and color of the museum, "hidden" it behind the old lime kiln, and "pressed" part of the exhibition space into the ground, making the height of the museum lower than the old lime kiln.
Liðsmenn
Li Baofeng
Yi Qingqing
Pan Jialiang
Myndheimildir
Image #1#2#3#4#5: Photographer Yilong Zhao, Pugongshan Geology Museum, 2021.

Kostað efni

Kannaðu umfram Designers.org

Uppgötvaðu vörur, þjónustu og tækifæri frá auglýsingaaðilum okkar.

Góð hönnun á skilið frábæra viðurkenningu

A' Design Award eru alþjóðleg, dómnefndarmetin viðurkenning fyrir góða hönnun. Taktu þátt í A' Design Award til að fá tækifæri til að öðlast leiðréttingarsöm viðurkenningu, frægð, virðingu og kynningu á verkum þínum. Tilnefndu verk þitt til A' Design Award og kepptu um hin eftirsóttu A' Design Prize verðlaun.

Tilnefna