Ihe emepụtara bụ Hours on the Slope Ọlụ Isi: Ụlọ Ọrụ Nrụpụta, Ụlọ Ọrụ Ọchịchị nke T.E and C Architects Associates bụ onye meriri a na-asọpụrụ nke ukwuu nke 2021 Ihe Nrite A' Design Award nke Bronz na Udi Asọmpi Nhazi Ụlọ Owu, Ụlọ na Ihe Owuwu.
BronzỤlọ Owu· 2021
Hours on the Slope Ọlụ Isi: Ụlọ Ọrụ Nrụpụta, Ụlọ Ọrụ Ọchịchị
nke T.E and C Architects Associates
Onye Ahịa: T.E and C Architects Associates
Onye Meriri Ihe Nrite A' Design Award nke Bronz na Udi Ụlọ Owu
Onye Meriri Onyinye A Kwadoro
Nyochaa Ọnọdụ Onyinye maka #106869Nhazi a
Maka Hours on the Slope Ọlụ Isi: Ụlọ Ọrụ Nrụpụta, Ụlọ Ọrụ Ọchịchị
Ederede Akwụkwọ: Hours on the Slope bụ ụlọ ọrụ nrụpụta na ụlọ ọfịs dị na Taichung, Taiwan. E kewara saịtị ahụ n'ime ụlọ atọ ndị e doziri iji zaghachi gburugburu ebe na ntụgharị ihu ha. N'akụkụ ọdịda anyanwụ, ebe anyanwụ na-acha nke ọma, windo ndị gbara ojii na mbelata ogo windo na-eme ka mmetụta oke nnukwu ya pụta ìhè. Nkume granite na sistemu ntee ụlọ akwụkọ ndụ na-ekpuchi mgbidi ndị dị n'èzí. A họọrọ nkume mosaic sitere n'okike maka elu gbagọrọ agbagọ nke ụlọ ọfịs ahụ. Sistemu ọdọ mmiri e liri e li na-eduba ikuku jụrụ oyi si na mpụga banye n'ime ụlọ nrụpụta, ebe panel solar dị n'elu ụlọ na-eweta ndo na ebe ndọba ụgbọala dị n'elu kacha elu.
Nkwanye Ugwu
Maka Ihe Nrite A' Design Award nke Bronz
Hours on the Slope Ọlụ Isi: Ụlọ Ọrụ Nrụpụta, Ụlọ Ọrụ Ọchịchị meriri A' Design Award nke Bronz, nnabata dị oke ugwu e nyere design ndị pụtara ìhè nke a ma ama maka nzụlite ihe, ọgụgụ isi na nghọta. Ndị meriri na Bronz bụ ihe e mere nke ndị nwere nka nke ukwuu ma dị mma n'imepụta nke na-egosi ahụmahụ buru ibu, echiche na ọgụgụ isi nke ndị designer ha. A na-atụ anya na Hours on the Slope Ọlụ Isi: Ụlọ Ọrụ Nrụpụta, Ụlọ Ọrụ Ọchịchị ga-abụ ihe a na-asọpụrụ nke ukwuu, a na-eto na a hụrụ n'anya, nke dị oke ọrụ ma dị ọhụrụ. Design a meriri A' Design Award nke Bronz na-agụnye ụzọ kacha mma n'ime nka, sayensị, design na teknụzụ, ma dị mma nke ukwuu maka nlebara anya ya n'obere ihe. Hours on the Slope Ọlụ Isi: Ụlọ Ọrụ Nrụpụta, Ụlọ Ọrụ Ọchịchị na-emezu mkpa nke ọma, na-emetụ ọchịchọ aka, na-adọrọ mmetụta obi ma na-adọta ọchịchọ ịmara.
N'azụ Nhazi a
Ngwugwu Mgbasa Ozi
Nkwurịta okwu, ndị otu na nkọwa teknụzụ nke onye nhazi nyere.
- Àgwà Pụrụ Iche
- The entire area is mainly divided into three buildings, while the design takes into consideration the relationship between the environment and the direction, adopting dark windows while reducing window area in ordered arrangement on the west side with excessive sun exposure to highlight the sense of volume.
- Nha & Mkpuchi
- The project is 63767 square meter.
- Mkpado
- Architecture, Factory, Office, Plant, Building
- Teknụzụ Mmepụta
- The factory plant with the largest area has adopted the coating system with the Green Building Mark, which contains no formaldehyde, TVOC volatile organic compounds, and hazardous substances; moreover, it is a coating system featuring low-carbon-footprint, no excessive external wall decorative wastes…etc. Due to the characteristics of the coating system such as gapless and low water absorption, etc., it can clean itself when the rain pours, making it easy to maintain.
- Ịma Aka Imepụta
- This project has also set up a rainwater recycling pool, collecting roof water for watering potted plants, it further set up an eco-pool in the alfresco retracted 20m of greenbelt, establishing water recirculation system to proceed with the conditioning of the microclimate inside the base.
- Nchọpụta
- A large area of approximately 12,250 m2 of solar energy layout is placed on top of the roof, where besides conducting solar energy power generation, it can also act as a heat insulator for the parking lot on the top floor. The design also placed the air-conditioned factory plant underneath the parking lot, capable of completely blocking off the roof heat transmission caused by the large roof, thereby decreasing the air-conditioning energy consumption.
- Mkpali
- The main materials for the external wall include granite and green building coating system. To create the rock solid spirit of the enterprise and the fusion with the environment, the office building selected natural stone for the mosaic on the curved surface.
- Oge Ọrụ
- The project finished in December 2018 in Taichung, Taiwan.
- Usoro Ọrụ
- The main factory plant section is air-conditioned with the special arrangement of buried pipeline wind-guiding system, which guides in the external air at a lower temperature from the inlet/outlet on the north side together with potted plant section via the particular height difference of this base, which then cools the temperature down via the deep soil 10m underground, thereby accessing outdoor fresh air for air-conditioner cooling and exchange through the most natural cooling approach.
- Ndị Otu
- Design Director: Wen Tong Hsieh
Designer: Kang Cheng Liu
Yung Chi Huang
Sheng Xiang Lin
Cheng-Tsung Chen
Ming-Hsing Su
Pei-Yu Lin
Yu-Chien Huang - Asụsụ Foto
- Image #1-5: Photographer Pei Yu Lin, Hours on the Slope, 2019.
Nkwado
Nyochaa Karịa Designers.org
Chọpụta ngwaahịa, ọrụ na ohere sitere n'aka ndị mmekọ mgbasa ozi anyị.
Ihe Ndị Ọzọ Ị Ga-Achọpụta
Nhazi Ndị Yiri Ya
Chọpụta nhazi ndị ọzọ nwetara onyinye sitere n'otu udi, ahọpụtara site na ịdị mma.