Tha Doe O-Mega Urban Complex Príomhfheidhm: Foirgneamh Ilúsáide le Peng Architects na bhuannaiche air leth urramach anns an fharpais chliùitich 2022 Duais Umha A' Design Award ann an Roinn Farpais Dealbhadh Ailtireachd, Togalaichean agus Structaran.
UmhaAiltireachd· 2022
Doe O-Mega Urban Complex Príomhfheidhm: Foirgneamh Ilúsáide
Neach-ceannach: Peng Architects
Buannaiche Duais Umha A' Design Award ann an Roinn Ailtireachd
Buannaiche Duais Dearbhaichte
Dearbhaich Inbhe na Duaise airson #127977An Dealbhadh
Mu dheidhinn Doe O-Mega Urban Complex Príomhfheidhm: Foirgneamh Ilúsáide
Téacs an Leabhair: Is foirgneamh ilúsáide é Ionad Uirbeach Doe O-Mega a dearadh do láithreán i Bonifacio Global City i Manila. Clúdaíonn an fhoirm eiliptiúil, thríthoiseach cruthach O achar 400,000 méadar cearnach agus tá oifigí, áiteanna cónaithe, óstán, siopaí, agus spásanna cruinnithe ann. Fanann an atrium ar scáth don chuid is mó den lá, ag cruthú spás lasmuigh compordach, agus stiúrann tollán gaoithe an aer nádúrtha chun an atrium agus an lobaí a fhuarú. Laghdaíonn coincréit dathanna éadroma, painéil alúmanaim, agus gloine an t-ionsú teasa. Bailíonn ráillí gloine fótavoltach fuinneamh gréine, agus tá gairdín poiblí ar dhíon an phóidiam.
An Aithneachadh
Mu dheidhinn Duais Umha A' Design Award
Tha Doe O-Mega Urban Complex Príomhfheidhm: Foirgneamh Ilúsáide air Duais Umha A' Design Award a bhuannachadh, aithneachadh gu math urramach a bheirear do dhealbhaidhean sònraichte a tha air an comharrachadh le cruthachalachd, innleachd agus geurchuis. Tha buannaichean Umha nan obraichean gu math sgileil agus gu sònraichte cruthachail a dhearbhas eòlas farsaing, mac-meanmna agus tapachd an luchd-dealbhaidh. Thathar an dùil gum bi Doe O-Mega Urban Complex Príomhfheidhm: Foirgneamh Ilúsáide na nì air a bheil mòran meas, ion-mholta agus gràdhach, a tha gu sònraichte proifeiseanta agus ùr-ghnàthach. Tha an dealbhadh seo a bhuannaich Duais Umha A' Design Award a' cur nan cleachdaidhean as fheàrr ann an ealain, saidheans, dealbhadh agus teicneolas an gnìomh, agus tha e sàr-mhath airson an aire do mhion-fhiosrachadh. Bidh Doe O-Mega Urban Complex Príomhfheidhm: Foirgneamh Ilúsáide a' sàsachadh fheumalachdan gu h-iongantach, a' suathadh ri miannan, a' tàladh faireachdainnean agus a' togail fiosrachd.
Air Cùl an Dealbhaidh
Pasgan Naidheachd
Creideasan, buill sgioba agus fiosrachadh teicnigeach a chuir an dealbhaiche ri chèile.
- Feartan Sònraichte
- After the redevelopment, in addition to the renovation of the original working space, the project will create a shared complex space integrating fashion and entertainment which open to the public population. The project is expected to be a landmark building, which also provides a demonstration of the green and sustainable development of the city.
- Tomhasan & Pacadh
- The fact that large-scaled buildings will produce microclimatic changes to the environment happens to be an architectural strategy in this project. The atrium is under shade most of the day, naturally becoming a comfortable outdoor space. The setting of the wind tunnel can reduce wind resistance and save structural materials at the same time. Natural wind adjusts the temperature of the atrium and the ventilation of the lobby to adjust the temperature as well, which can reduce the energy consumption of air conditioning.
- Tagaichean
- Architecture, complex, park, building, office
- Teicneòlas Cinneasachaidh
- Considering the hot and humid climate in Manila, the materials need to be rust-proof and moisture-proof. At the same time, the facade of the building uses a light color to reduce the amount of light absorption and reduce the temperature. The main materials adopted include concrete, aluminum plate, and glass.
- Dùbhlan Dealbhaidh
- To solve the problem of how to integrate the park and landscape in the urban complex, the park landscape is raised to the roof of the podium, becoming a comfortable roof garden that combines the sunlight of the building with the self-shading and ventilation.
- Rannsachadh
- Located at the northeast corner of Bonifacio Global City in the Philippines, the project site is the most economically prosperous area in Metro Manila. The original building is the office of the Philippine National Petroleum Corporation and the Department of Energy.
- Brosnachadh
- Inspired by the existing atrium office space, the design is combined with the elliptical outline to maximize the utilization rate of the site. Under the conditions of echoing the sunshine, external climate, urban landscape, and commercial connection, the building forms a three-dimensional O-shape urban complex (Mega City) with a scale of 400,000 square meters, including office, residential, hotel, commerce, and meeting space.
- Faid a' Phròiseict
- The project is designed in 2017 and it has been approved by the President of the Philippines, Rodrigo Duterte, and it has gone to further phrase.
- Sruth Obrachaidh
- The railings of the building are equipped with transparent photovoltaic glass, which can collect and use solar energy. The roof of the commercial podium is designed as an urban garden, which greatly reduces the heat island effect. It is not only the front garden of the hotel but also a sports park for citizens to share and interact.
- Buill na Sgioba
- Peng Chien Chang,
Zixuan Huang,
Kai Wang,
Siru Chen,
Simin Lin,
Yiyao Chen
Pàighte
Rannsaich Nas Fhaide na Designers.org
Lorg toraidhean, seirbheisean agus cothroman bho na com-pàirtichean sanasachd againn.
Barrachd ri Rannsachadh
Dealbhaidhean Co-cheangailte
Rannsaich barrachd dhealbhaidhean a choisinn duaisean bhon aon roinn-seòrsa, air an taghadh a rèir fiùghalachd.