The Courtyard Rekreativt Rum af Nischal Abhaykumar er en højt anset vinder af den meget prestigefyldte 2019 A' Design Award i Bronze i konkurrencekategorien Arkitektur-, Bygnings- og Konstruktionsdesign.
BronzeArkitektur· 2019
The Courtyard Rekreativt Rum
Klient: M9 Design Studio
Vinder af A' Design Award i Bronze i kategorien Arkitektur
Verificeret Prisvinder
Verificer Prisstatus for #76233Designet
Om The Courtyard Rekreativt Rum
Gårdhaven er en rekreativ event-bygning designet til fællesskabsarrangementer. Den to-etagers struktur er rektangulær i planen med fladt tag, bølgede metalvægge og en stålramme af mildt stål. En facade af bølget polycarbonat omslutter det multifunktionelle eventrum på første sal og bringer naturligt lys ind i interiøret. Teksturerede gardiner beklæder facaden for at kontrollere lyset under forestillinger. Indvendigt er sortmalede stålbjælker, synlige dæklofter samt gulve af beton og træ efterladt synlige. Masseproducerede komponenter holdt omkostningerne nede og byggeperioden på 75 dage.
Anerkendelsen
Om A' Design Award i Bronze
The Courtyard Rekreativt Rum er vinder af A' Design Award i Bronze, en højt prestigefyldt anerkendelse, der tildeles enestående designs, som udmærker sig ved kreativitet, opfindsomhed og skarpsindighed. Bronzevinderne er rigeligt dygtige og påfaldende kreative artefakter, der bekræfter deres designeres store erfaring, fantasi og snilde. The Courtyard Rekreativt Rum forventes at være en højt estimeret, beundret og kær genstand, der er bemærkelsesværdigt professionel og innovativ. Dette design, der har vundet A' Design Award i Bronze, indarbejder bedste praksis inden for kunst, videnskab, design og teknologi og er fremragende på grund af sin sans for detaljer. The Courtyard Rekreativt Rum tilfredsstiller pragtfuldt behov, rører længsler, charmerer følelser og appellerer til nysgerrigheden.
Bag Designet
Pressemappe
Credits, teammedlemmer og tekniske detaljer leveret af designeren.
- Unikke Egenskaber
- The aim was to create a unique building using mass-produced components – cheap price and with short execution timeline. Rectangular in plan, the two-storey building features a flat roof, corrugated metal walls and a mild steel frame. Corrugated polycarbonate sheet facade encases the multi-purpose event space on the first floor. Thin and translucent material is used to replace the regular exterior walls, where natural light can be maximised in the interior space.
- Dimensioner & Emballage
- Built-up area - 3500 sqft. (New building only)
Site area - 6000 sqft. - Tags
- Adaptive re-use, modern, industrial, old and new, polycarbonate box
- Produktionsteknologi
- A steel structure made up of I-beams is on show inside the building and has been painted black. Deck sheet ceilings are left exposed, while the floors encompass a mixture of concrete and timber.
- Designudfordring
- The designated space earlier comprised of a single two-storey building along with a courtyard, set in the client’s grandparents’ house. It is almost a 50-year-old residence along with a garden café that was utilised for events. In the absence of a dedicated space for various functions, the setting of the space was informal and could not generate much revenue. In order to fill the gaps in the existing design, a new structure was introduced and made sure that it would not overpower the older one in height or by use of materials.
- Forskning
- Public space is and has been an integral part of communities, serves as a location for people to meet, relax and exchange ideas - refreshment of ones mind or body after work that amuses or stimulates. Informal open recreational space is that which provides opportunities for more passive recreational pursuits. It may also have a scope for informal play. Participation in recreation is regarded as being essential in contributing to people's well being.
- Inspiration
- The site previously formed part of the garden of a house occupied by the clients' grandparents. The design of the new building was intended to minimise its impact on this existing house, both during and after its construction. A desire to maintain a connection with the existing house informed the decision to keepas much of the existing garden area as possible, and to position the entrance to the new building so it opens onto this space.
- Projektvarighed
- The building was completed in June 2018 and the duration of construction was 75 days.
- Driftsflow
- The inside of this polycarbonate sheet facade is lined by rich textured drapes to control the amount of natural light inside during specific shows and events. Windows are made from the same material as the walls, so they don't offer any additional light but can be opened to let fresh air into the building. At night, lights glowing from within transform the building into a huge light-box along the streetscape.
- Teammedlemmer
- Nischal Abhaykumar
Jesal Pathak
Preethi B Raju
Karamveer Singh - Billedkreditering
- Shamanth Patil Photography
Sponsoreret
Udforsk Udover Designers.org
Opdag produkter, tjenester og muligheder fra vores annoncepartnere.
Mere at Udforske
Relaterede Design
Udforsk flere prisvindende design fra samme kategori, udvalgt efter fortjeneste.